The same signed cards as the trainer above, in one list to read or print.
- Who makes the code decisions on inspection, repairs and return to service under API 570?
- The authorized piping inspector. The decision is not handed to the person who did the work, a foreman or maintenance management.API 570: inspection organization and responsibilities
- Who is responsible for the piping inspection program?
- The owner/user, who runs it through an inspection organization.API 570: owner/user inspection organization
- Who does or reviews the design work for a rerating or an alteration?
- The piping engineer.API 570: responsibilities (piping engineer)
- An examiner finds an indication. Does the examiner decide whether it is acceptable to the code?
- No. The examiner performs the NDE and reports the result. The inspector decides acceptability.API 570: responsibilities (examiner and inspector)
- What is a piping circuit?
- A group of piping with similar design, material and process conditions, expected to degrade in a similar way, so it can be inspected and assessed as one unit.API 570: definitions (circuit); API RP 574: inspection planning by circuit
- What is a CML?
- A condition monitoring location: a marked spot on a circuit where wall thickness is read again and again, so a trend can be built.API 570: definitions (condition monitoring location)
- Why is a CML physically marked?
- So the same spot is read every time. Readings from different spots cannot be trended, and a single reading is not a corrosion rate.API 570: thickness measurement locations
- What does an external visual inspection look at?
- Leaks, insulation and jacketing, supports, alignment and vibration, from outside the line.API 570: types of inspection (external visual); API RP 574
- A corroded spool is replaced with the same pipe to the same design. Repair, alteration or rerating?
- Repair. It restores the existing design.API 570: definitions (repair, alteration, rerating)
- A line is rebuilt in a larger pipe size. Repair, alteration or rerating?
- Alteration. It changes the design.API 570: definitions (repair, alteration, rerating)
- Is one closed valve positive isolation on a hazardous line?
- No. Use a blind, or a double block with a bleed, then depressure, drain and verify before opening.API 570: safety precautions; API RP 574: preparation for inspection
- What is the hazard of pyrophoric iron sulfide, and how is it controlled?
- It forms in sour service and can ignite when it dries in air. Keep it wet and plan for it before opening the line.API RP 574: safety precautions; API 570: safety