Free sample · ASQ CQI

Try a full lesson: Cp and Cpk from a worked example

This is a complete lesson from the course (module 11 of 12, Outline section IV.D), followed by 10 practice questions with full explanations. Nothing to sign up for.

What this lesson covers

Statistical process control is one topic of Quality Assurance and Improvement, which carries 23 of the 100 scored questions on the ASQ CQI exam. Capability questions are some of the most reliable marks on the exam, because they are pure arithmetic once you know which number goes where. This free lesson works one example from raw chart values to a decision, then shows the traps that cost people the mark.

You need four things for every capability question: the upper specification limit (USL), the lower specification limit (LSL), the process mean and the process standard deviation (sigma). The question either gives sigma or gives you what you need to estimate it.

The idea in one line

Cp asks whether the spread fits; Cpk asks whether it fits where the process actually sits.

Picture the specification as a garage and the process spread (6 sigma wide) as a car. Cp compares the width of the garage with the width of the car. Cpk asks how close the car is to the nearer wall. A narrow car parked against one wall has a good Cp and a poor Cpk.

The formulas

IndexFormulaWhat it tells you
Cp(USL - LSL) / (6 sigma)Potential, if the process were centered
Cpu(USL - mean) / (3 sigma)Room on the upper side
Cpl(mean - LSL) / (3 sigma)Room on the lower side
Cpkthe smaller of Cpu and CplActual capability, counting the mean's position

Two facts to hold onto:

  • Cpk is never larger than Cp. They are equal only when the mean sits exactly in the middle of the specification.
  • Each Cpk side counts in units of 3 sigma. A Cpk of 1.00 means the nearer limit is exactly 3 sigma from the mean; 1.33 means 4 sigma; 2.00 means 6 sigma.

The worked example

The setup (invented). A shaft diameter is specified as 25.00 plus or minus 0.05 mm, so LSL = 24.95 mm and USL = 25.05 mm. The process is in statistical control on an X-bar and R chart with subgroups of 5. The chart gives X-double-bar = 25.010 mm and R-bar = 0.0349 mm. For n = 5, d2 = 2.326.

The working (5 steps)

Step 1: confirm the process is stable. Capability means something only for a process in control. The chart shows no points outside the limits and no runs or trends, so go ahead. If it were out of control, the right answer would be to find and remove the special causes first.

Step 2: estimate sigma. Within-subgroup sigma = R-bar / d2 = 0.0349 / 2.326 = 0.0150 mm. Check: 2.326 x 0.0150 = 0.0349.

Step 3: Cp. Specification width = 25.05 - 24.95 = 0.10 mm. Six sigma = 6 x 0.0150 = 0.090 mm. Cp = 0.10 / 0.090 = 1.11.

Step 4: both sides of Cpk. Three sigma = 0.045 mm.

  • Cpu = (25.05 - 25.010) / 0.045 = 0.040 / 0.045 = 0.89
  • Cpl = (25.010 - 24.95) / 0.045 = 0.060 / 0.045 = 1.33

Step 5: take the smaller. Cpk = 0.89, set by the upper side.

Second route to check it. The mean is 0.010 mm above the 25.00 mm midpoint. As a share of the half-width (0.05 mm) that is k = 0.010 / 0.05 = 0.20. Then Cpk = Cp x (1 - k) = 1.11 x 0.80 = 0.89. Both routes agree.

Reading the result

How much is out? The upper limit sits z = 0.040 / 0.0150 = 2.67 sigma above the mean. The area beyond z = 2.67 is about 0.0038 (from a normal table; an exam item gives it to you). So about 0.38% of shafts, or roughly 3,800 parts per million, are oversize. The lower limit is 4 sigma away (0.060 / 0.015), and the tail beyond z = 4 is tiny.

What should change? Two separate problems show up:

  1. The process is off center. Moving the mean down to 25.00 mm makes both sides equal, and Cpk rises to Cp: 1.11. That is often a quick adjustment.
  2. The spread is too wide for a 1.33 requirement. Even centered, Cp is only 1.11. Many customers ask for at least 1.33, but the number required is always the customer's. To reach Cp = 1.33 with a 0.10 mm specification, sigma must be no more than 0.10 / (6 x 1.33) = 0.0125 mm. Check: 0.10 / (6 x 0.0125) = 1.33. That is a process change (tooling, fixturing, material), not a knob on the machine.

So the answer to "what first?" is: center it (cheap, and it raises Cpk from 0.89 to 1.11), then work on variation to get from 1.11 to 1.33.

Pp and Ppk: the same formulas, a different sigma

Pp and Ppk use the overall standard deviation of all the individual readings (the ordinary sample s), not R-bar / d2. Overall sigma includes shifts between subgroups, so it is usually larger, and Pp and Ppk are usually lower.

Suppose the overall s for the shafts is 0.018 mm.

  • Pp = 0.10 / (6 x 0.018) = 0.10 / 0.108 = 0.93
  • Ppk = (25.05 - 25.010) / (3 x 0.018) = 0.040 / 0.054 = 0.74
  • Check: Ppk / Pp = 0.74 / 0.93 = 0.80, the same (1 - k) as before, because centering does not depend on which sigma you use.

A big gap between Cpk and Ppk says the process moves between subgroups more than it varies within them.

One-sided specifications

Many features have only one limit: a maximum runout, a minimum strength. Cp needs both limits, so it cannot be calculated. Cpk is just the one side that exists.

Example (invented): runout has only a maximum of 0.50 mm, the mean is 0.20 mm and sigma is 0.05 mm. Cpk = (0.50 - 0.20) / (3 x 0.05) = 0.30 / 0.15 = 2.00. Check: 0.20 + 6 x 0.05 = 0.50, so the limit is 6 sigma above the mean.

The traps that cost the mark

  • Taking the larger side. Cpk is always the smaller of Cpu and Cpl.
  • Dividing by 6 sigma for Cpk. Each side is a distance over 3 sigma; only Cp uses 6 sigma.
  • Using R-bar as sigma. Divide by d2 first.
  • Using control limits. Capability uses the specification limits. Control limits are about stability, not about the customer.
  • Skipping the stability check. An out-of-control process has no single capability to report.
  • Mixing within and overall sigma. Cp and Cpk use within-subgroup sigma; Pp and Ppk use the overall one.

Try it

The practice set with this lesson has 10 questions built on these steps. Work each one by the two-sided formula, then check it by a second route: reverse the formula, or use Cpk = Cp x (1 - k).

Not affiliated with or endorsed by ASQ. ASQ is named here only to describe the exam these materials prepare you for.

Practice set

Print these questions for a class (PDF) Answer key on page 2. Free, no signup.

Pick an answer, then check it. Every wrong option is explained too.

1. Quality Assurance and Improvement

A diameter has USL = 5.030 mm and LSL = 4.970 mm. The process standard deviation is 0.008 mm. What is Cp?

2. Quality Assurance and Improvement

The same diameter (USL = 5.030 mm, LSL = 4.970 mm, sigma = 0.008 mm) now runs at a mean of 5.012 mm. What is Cpk?

3. Quality Assurance and Improvement

Subgroups of 5 give R-bar = 0.0186 mm, and d2 = 2.326 for n = 5. The specification width (USL - LSL) is 0.060 mm. Estimating sigma as R-bar / d2, what is Cp?

4. Quality Assurance and Improvement

Runout has only an upper limit of 0.50 mm. The process mean is 0.20 mm and sigma is 0.05 mm. What is the capability index for the upper side (Cpk)?

5. Quality Assurance and Improvement

A process has Cp = 1.25 and Cpk = 0.75. The spread stays the same, and the mean is moved to the exact middle of the specification. What will Cpk become?

6. Quality Assurance and Improvement

A stable process has Cp = 1.60 and Cpk = 0.90. The customer requires Cpk of at least 1.33. What should be done first?

7. Quality Assurance and Improvement

Which pair of indices uses the overall standard deviation of all the data, rather than a within-subgroup estimate such as R-bar / d2?

8. Quality Assurance and Improvement

A specification is 0.12 mm wide (USL - LSL). The customer wants Cp of at least 2.00. What is the largest process standard deviation that meets it?

9. Quality Assurance and Improvement

A specification is 10.00 plus or minus 0.10. The process has Cp = 1.50, and its mean is 10.02. What is Cpk?

10. Quality Assurance and Improvement

A stable process has USL = 10.09, LSL = 9.95, mean = 10.03 and sigma = 0.02. The area beyond z = 3.00 is 0.00135 and beyond z = 4.00 is 0.00003. About how many parts per million fall above the USL?

Studying with a coworker? Send them this free lesson.

Free ASQ CQI study plan

A week-by-week plan from today to your exam, weighted to the published exam outline. We show it here and email you a copy.

The ASQ CQI course

Available now · instant access

Ready for the rest? The full course

  • 12modules of lessonsEvery task on the outline
  • 2full-length timed exams110 questions in 258 minutes each
  • 300practice questionsEach one explained
  • 1week-by-week study planSet to your exam date

Turn a practice answer into a study step. In untimed practice, ask Mic AI about any question you answer, follow up, then see your weakest topics and what to drill next.

See all 12 modules
  1. Shop math, algebra and unit conversions
  2. Geometry and trigonometry
  3. Basic statistics
  4. Gauges and measuring instruments
  5. Gauge selection, surface plate work and special equipment
  6. Calibration and measurement system analysis
  7. Drawings, GD&T and model-based definition
  8. Sampling, inspection planning and nonconforming material
  9. Testing methods and test software
  10. Quality improvement, audits and the basic quality tools
  11. Statistical process control and capability
  12. Problem solving, continuous improvement and resources
ASQ CQI course$149Get the ASQ CQI course · $149

Instant access. Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

    Compare plans

    Every answer comes with a full explanation.

    Questions are original and written to ASQ's published content outline. Code is cited by section number so you can look it up in your own copy. Think something is wrong? Report it.