Free ASP flashcards

12 flashcards from the Mathematical Calculations domain. Read the front, show the answer, then grade yourself. Cards you miss come back sooner when you return to this page. No signup.

0 due today12 to learn12 cards

Flashcard · Mathematical Calculations

Total recordable incidence rate formula?

Print these cards (PDF) · cut-out sheets: print double-sided, flip on the long edge

Send these free cards to a coworker.

The course has 120 cards with spaced review.It also adds every question you miss to your deck.

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

Not sure where to start? Take the free 10-question check.

All 12 cards

The same signed cards as the trainer above, in one list to read or print.

Total recordable incidence rate formula?
Recordable cases x 200,000 / hours worked.Safety math: incidence rate
What does the 200,000-hour base represent?
100 full-time workers x 40 hours a week x 50 weeks.Safety math: incidence rate
What goes in the DART rate numerator?
Cases with days away, restricted work or job transfer. Count cases, not days.Safety math: DART rate
Severity rate counts what?
Days lost or charged x 200,000 / hours worked.Safety math: severity rate
Allowed hours at level L with a 90 dBA criterion and 5 dB exchange?
T = 8 / 2^((L - 90) / 5). 95 dBA allows 4 h; 100 dBA allows 2 h.OSHA 29 CFR 1926.52, Table D-2
Noise dose formula?
D = 100 x sum of (time at each level / allowed time at that level), in percent.Noise dose (general acoustics)
Two equal noise sources combine to how much more?
About 3 dB more than one alone. Ten equal sources add 10 dB.Decibel addition (general acoustics)
Point source in open air: level change when distance doubles?
Falls about 6 dB.General acoustics
Fall clearance stack, measured from the anchor?
Free fall + deceleration + harness stretch + D-ring to feet + safety margin.Fall clearance (method)
NIOSH lifting equation load constant (US units)?
51 lb. RWL = 51 x HM x VM x DM x AM x FM x CM.NIOSH lifting equation
Lifting index formula and meaning above 1.0?
LI = load / RWL. Above 1.0, more workers are at risk; redesign by priority.NIOSH lifting equation
Flow through a duct?
Q (cfm) = V (fpm) x A (sq ft).Ventilation (general principle)