Flashcard · General Requirements

What is the statement of special inspections?

Print these cards (PDF) · cut-out sheets: print double-sided, flip on the long edge

Send these free cards to a coworker.

The course has 120 cards with spaced review.It also adds every question you miss to your deck.

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

Not sure where to start? Take the free 10-question check.

All 12 cards

The same signed cards as the trainer above, in one list to read or print.

What is the statement of special inspections?
The design professional's list, submitted with the permit, of each special inspection and test the project needs, whether each is continuous or periodic, and who performs it.Building code special inspection chapter, statement of special inspections
What does continuous special inspection mean?
Full-time observation of the work by the special inspector while the work is being done.Building code special inspection chapter, continuous special inspection
What does periodic special inspection mean?
Part-time or intermittent observation of the work, with the completed work checked at the stages the statement sets.Building code special inspection chapter, periodic special inspection
Who engages the special inspection agency?
The owner or the owner's agent, so the inspector is independent of the contractor whose work is checked.Building code special inspection chapter, special inspection agency
Can a special inspector accept a substitution of bolts or members?
No. The inspector records and reports it; the engineer of record decides on changes to the design.Building code special inspection chapter, special inspector duties
Does a structural observation visit by the engineer replace special inspection?
No. Structural observation is a separate duty; the special inspections on the statement still have to be done.Building code special inspection chapter, structural observation
Which documents does the special inspector inspect against?
The permitted drawings and project specification, and the standards they invoke. Shop drawings help locate work but do not override the design drawings.Building code special inspection chapter, special inspector duties
Who is told first about work that does not conform?
The contractor, right away, so the work can be corrected while it is still accessible.Building code special inspection chapter, discrepancy reporting
If a reported discrepancy is not corrected, who is notified next?
The design professional in responsible charge and the building department, before that phase of the work is complete.Building code special inspection chapter, discrepancy reporting
What closes a discrepancy?
Correction that the inspector re-inspects, or written acceptance as built by the engineer of record. A verbal OK on site does not.Building code special inspection chapter, discrepancy reporting
May the special inspector fix a discrepancy personally?
No. Doing the work makes the inspector part of the work being inspected.Building code special inspection chapter, special inspector duties
Who receives special inspection progress reports?
The building department and the registered design professional in responsible charge, at the interval the jurisdiction sets.Building code special inspection chapter, reports