Free NICET FA IV flashcards

12 flashcards from the Installation, Planning, and Maintenance domain. Read the front, show the answer, then grade yourself. Cards you miss come back sooner when you return to this page. No signup.

0 due today12 to learn12 cards

Flashcard · Installation, Planning, and Maintenance

What does NICET task 4.1.1 ask a Level IV technician to manage?

Print these cards (PDF) · cut-out sheets: print double-sided, flip on the long edge

Send these free cards to a coworker.

The course has 120 cards with spaced review.It also adds every question you miss to your deck.

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

Not sure where to start? Take the free 10-question check.

All 12 cards

The same signed cards as the trainer above, in one list to read or print.

What does NICET task 4.1.1 ask a Level IV technician to manage?
A fire alarm department as a whole: design, sales, operations and service, often across several projects and a service book at once.Good practice (no code section)
Name the three handoffs where a fire alarm department most often loses money.
Sales to operations, design to field, and project to service.Good practice (no code section)
What should a sales-to-operations turnover meeting pass on?
What was sold: scope, exclusions, assumptions, the promised schedule and the labor budget.Good practice (no code section)
How should a manager judge the sales function?
By hit rate and by the margin the jobs actually earn, not by revenue booked.Good practice (no code section)
How should a manager judge the design function?
By resubmittal count and by field changes caused by drawing errors.Good practice (no code section)
What three parts make a sound staffing plan?
Coverage (a qualified, named person in every required role), ratio (each Level I or II works under someone who can check the work) and depth (no job depends on one person).Good practice (no code section)
Two jobs need the same scarce technician. How do you choose?
Compare what each delay costs: liquidated damages, fixed occupancy dates, retainage. Put the resource where delay costs most and record the change in writing.Good practice (no code section)
The AHJ finds the same defect on two of your jobs. What does that suggest?
A procedure gap, not two bad crews. Fix the written procedure and check that the fix works.Good practice (no code section)
What is a compliance matrix in an RFP response?
A list of every requirement in the request, where your response meets it, and any exception you are taking.NASCLA Contractor's Guide (by topic)
A specification cites an older NFPA 72 edition than the AHJ enforces. What do you do while bidding?
Raise it as a question before bids close and state which edition your price assumes.Good practice (no code section)
Which contract terms touch codes and the AHJ?
Code editions enforced, who gets permits and arranges the acceptance test, completion documents, any post-acceptance testing and maintenance, and the change order process.NFPA 72-2022 ch. 7 and ch. 14
A contract makes you responsible for code compliance of the engineer's design. What do you do?
Send it for legal review and negotiate it before signing. It shifts design liability to you.NASCLA Contractor's Guide (by topic)