Free NICET I&T FA I flashcards

12 flashcards from the Plan and Coordinate Work domain. Read the front, show the answer, then grade yourself. Cards you miss come back sooner when you return to this page. No signup.

0 due today12 to learn12 cards

Flashcard · Plan and Coordinate Work

Which three records do you compare to build a device count before a periodic test?

Print these cards (PDF) · cut-out sheets: print double-sided, flip on the long edge

Send these free cards to a coworker.

The course has 122 cards with spaced review.It also adds every question you miss to your deck.

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

Not sure where to start? Take the free 10-question check.

All 12 cards

The same signed cards as the trainer above, in one list to read or print.

Which three records do you compare to build a device count before a periodic test?
The record drawings, the panel's point list or programming report, and last year's inspection and test report. Then walk the building to check them against what is installed.NFPA 72-2022 Chapter 7; 14.2
Why is the panel's point list not enough on its own to count devices?
It shows what the panel is programmed for, not what is on the ceiling. A removed device can leave an orphan address, and a new device may be missing from the drawings.NFPA 72-2022 Chapter 7
You find three detectors on the point list that are not on the record drawings. What do you do?
Confirm them on site, test them, and note on the report that the drawings need updating so the owner can have them corrected.NFPA 72-2022 Chapter 7; 14.6
What is an orphan address?
A point still programmed in the panel after its device was removed. Record it as a finding so the program can be corrected.NFPA 72-2022 14.6
Who is your main contact for access and timing during a periodic test?
The owner or the building manager acting for the owner. The owner is responsible for the system.NFPA 72-2022 14.2
Name four things to agree with the building manager before testing.
Access to rooms and ceilings, when appliances may sound, who tells the occupants, and which interfaces (doors, elevators, fans) will operate.NFPA 72-2022 14.2
Why agree in advance which interfaces will operate during the test?
Doors closing, elevators recalling and fans stopping affect people and other trades, and the person responsible for each may need to be present.NFPA 72-2022 14.2; Chapter 21
Where are the periodic inspection and test frequencies and methods?
In Chapter 14 of NFPA 72, mostly in its tables.NFPA 72-2022 Chapter 14
Who decides which edition of the code applies to an existing system?
The authority having jurisdiction, through the edition and local changes it has adopted. The newest printed edition is not automatically the one that applies.NFPA 72-2022 14.1
The work order says annual test, but some devices are also due for another inspection. What do you do?
Tell the owner before starting, so the scope can match what is due under the Chapter 14 tables.NFPA 72-2022 Chapter 14
Which section covers notifications before testing?
14.2.4 in NFPA 72-2022.NFPA 72-2022 14.2.4
What do you tell the supervising station before testing?
The account, which signals to expect, and roughly how long the test will run, so test signals are not treated as real ones.NFPA 72-2022 14.2.4