OSHA electrical (Subpart K) for the CHST
Temporary power is everywhere on a construction site, and it is a leading cause of fatal injuries. The CHST blueprint puts common electrical hazards and controls in Domain 1. Subpart K (29 CFR 1926.400 to 1926.449) is the construction electrical standard. This guide maps the parts the exam leans on, in our own words.
Check anything you rely on against your own licensed code book and the edition your AHJ enforces.
Where Subpart K sits in the blueprint
Electrical hazards are item 2 in the Domain 1 knowledge list, and Domain 1 is 36.6% of the CHST. Most questions test a control choice: de-energize, ground-fault protection, guarding or distance.
The sections to know
- 1926.403 covers general requirements: listed or labeled equipment, installation and use per instructions, and working space.
- 1926.404 covers wiring design and protection. For temporary power, 1926.404(b)(1) is the key paragraph: ground-fault circuit interrupters on the 120-volt, single-phase, 15 and 20 ampere receptacles that are not part of the permanent wiring, or an assured equipment grounding conductor program as the alternative.
- 1926.405 covers wiring methods, components and equipment: temporary wiring, cords and cables, lighting and flexible cord use.
- 1926.416 covers general safety requirements: no one works near an energized circuit that they could touch, unless it is de-energized or guarded, and it covers cord and cable condition.
- 1926.417 covers lockout and tagging of circuits: equipment is de-energized, locked or tagged, and tested before work.
- 1926.449 holds the definitions.
Overhead power lines near cranes and booms are also covered in Subpart CC and near scaffolds in Subpart L.
Try one question
Question 1 of the free 10-question check on CHST. No signup. Then ask Kick, the AI study assistant, why the answer is right and the others are wrong.
Emergency Preparedness, Incident Investigation, and Response
On a building under construction, what is the longest allowed travel distance from any point of the protected area to the nearest fire extinguisher?
Press A-D or 1-4 to choose an answer while this question is on screen.
Choose an answer to begin
Controls in order
- Eliminate the hazard: de-energize and lock out.
- Engineering controls: GFCIs, insulation, guarding, grounded equipment.
- Administrative controls: the assured grounding program, inspections and test schedules, permits.
- PPE: insulating gloves and tools, as the last layer.
Ask Kick before you buy AI your AI study assistant
See what's on the CHST exam, test yourself with 5 quick questions, or find the plan that fits you.
The CHST course
Available now · instant accessLearn each CHST blueprint domain, then prove it on two full-length timed practice exams.
- 4modules of lessonsEvery task on the outline
- 2full-length timed exams200 questions in 240 minutes each
- 591practice questionsEach one explained
- 1week-by-week study planSet to your exam date
Turn a practice answer into a study step. In untimed practice, ask Kick AI about any question you answer, follow up, then see your weakest topics and what to drill next.
Instant access. Terms and refunds · Secure checkout by Stripe · Billed by Nori Software
Every answer comes with a full explanation.
Common mix-ups
- GFCI or assured grounding? Both are allowed on temporary power: a GFCI for each receptacle, or a written assured grounding program with its testing and records. Read which one the question's site uses.
- Tagout is not lockout. A tag warns and a lock prevents. Lockout is the stronger control.
- Guarded is not de-energized. The exam may offer a barrier where the correct action is to de-energize.
- Distance changes with voltage. The clearance figures are in tables and grow with voltage. Use your own copy.
How to practice
For each of the four control levels, list one temporary power example. Then work questions that describe a damaged cord, a wet area or a line near a boom, and decide the first action.
Related guides: fall protection and cranes and derricks.
Practice it
Take the free 10-question check. It covers the four CHST domains, needs no signup and explains every answer, so you see whether this subpart is a weak spot. The CHST study guide shows where it fits in a six-week plan.
Not affiliated with or endorsed by BCSP.
Sources
Show the list
- 29 CFR 1926 Subpart K, Electrical, OSHA.
- CHST Examination Blueprint (CHST5, V.2022.04.12), Board of Certified Safety Professionals.
Facts come from the sources listed above. If something has changed, tell us and we will correct it within 2 business days.
Your next step
Ready to see where you stand on CHST?
Free, untimed and scored by domain. No signup.
Start the free 10-question checkCHST course. Lessons, timed practice exams and a plan around your exam date. Get CHST course · $149 See the plans or read the free sample lesson.Terms and refunds
Want a timed run? Try the free 25-question mini-mock. The first 5 need no email.
Free tools for this topic
Prefer paper? Free printables
- Print a class quiz (free PDF). 5 practice questions with an answer key on page 2.
- Print the flashcards as cut-out cards (free PDF). The free flashcard sample, ready to cut and carry.