Crane parts of line calculator

Add the hook block and rigging to the load, enter the allowable single-line pull, and get the fewest parts of line that keep each line within it. The result is then checked against an invented example chart's hoist limits, and you can apply a sheave-efficiency factor as an option.

Find the minimum parts of line

Find the fewest parts of line that keep every line under its allowable pull. Static line pull only, not a load chart, rope selection or lift approval.

Enter the lower of the hoist's rated line pull and the wire rope's allowable pull for this crane, from the manufacturer's data.

Option: sheave efficiency
Minimum parts of line
4
Total load on the hook
21,000 lb
Lead line pull at 4 parts
5,250 lb
Share of allowable pull used
87.5%

20,000 + 800 + 200 = 21,000 lb. 21,000 ÷ 6,000 = 3.5, rounded up to 4 parts.

Invented example chart check: At 4 parts the example chart allows 44,000 lb, which covers the 21,000 lb total load.

Example crane (invented for practice): maximum hoist load by parts of line (lb). Single-line pull 11,000 lb.
Parts of lineMaximum hoist load (lb)
111,000
222,000
333,000
444,000
555,000
664,000
770,000
870,000

The crane manufacturer's load chart, its reeving and line pull notes, and the wire rope rating govern. Use the lower of the hoist's rated line pull and the rope's allowable pull, and never lift more than the chart allows at the actual radius.

Parts of line formula

Parts of line are the lines of hoist rope running between the boom head (or upper block) and the hook block. With the hook block hanging still, the parts are the only upward forces on it, so vertical equilibrium gives n × T = W, where W is the total load on the hook and T is the tension in each part. Setting T to the allowable single-line pull P gives n = W ÷ P, rounded up to the next whole part.

W must include everything below the boom head: W = load + hook block + rigging (slings, shackles, spreader or lifting beam). If your procedure also counts the weight of the hoist rope below the boom head, add it to the rigging figure. This is our derivation from the equilibrium condition in OpenStax, section 12.1; it assumes every part shares the load equally.

Round up even when the ratio is only just over a whole number. 3.01 needs 4 parts, because 3 parts would put each line above the allowable pull. When the ratio is exactly a whole number, that number of parts is enough.

Worked example: 20,000 lb load, 6,000 lb line pull

Total load = 20,000 + 800 (block) + 200 (rigging) = 21,000 lb. 21,000 ÷ 6,000 = 3.5, which rounds up to 4 parts of line. Each part then carries 21,000 ÷ 4 = 5,250 lb, or 87.5% of the allowable pull. Leaving out the block and rigging would give 20,000 ÷ 6,000 = 3.33, the same 4 parts here, but with a 17,500 lb load the omission matters: 17,500 ÷ 6,000 = 2.92 rounds up to 3 parts, while the true 18,500 lb total gives 3.08 and needs 4 parts.

These fictional inputs illustrate the arithmetic; they are not taken from any crane, chart or exam question.

Checking the result against a chart's hoist limits

Line pull is only one limit. A load chart usually also lists the maximum load for each number of parts of line, and that figure can be lower than parts × line pull. The calculator checks your result against the invented chart below: single-line pull 11,000 lb, with rows from 1 to 8 parts.

  • A 62,000 lb total load on the 11,000 lb line pull needs 62,000 ÷ 11,000 = 5.64, so 6 parts. The example chart allows 64,000 lb at 6 parts, so the check passes.
  • A 66,000 lb total load gives exactly 6 parts by line pull, but the example chart allows only 64,000 lb at 6 parts. 7 parts (70,000 lb) satisfy both checks, so 7 governs.
  • Above 70,000 lb the example chart has no row, however many parts you reeve. A larger total load needs a different crane or configuration.

The chart and its numbers are invented for practice and match no real crane. On a real lift, read the line pull, the parts-of-line limits and the gross capacity at the actual radius from that crane's own chart. Then subtract deductions with the net capacity calculator, and find the radius from boom length and angle with the crane radius and boom angle calculator.

Option: sheave efficiency

The equal-sharing model ignores friction. Real sheaves lose a little tension at each turn, so while hoisting, the lead line to the drum pulls more than W ÷ n. If each sheave passes on a fraction e of the tension, the parts carry T, T ÷ e, T ÷ e², and so on, and they add up to W. Solving that series gives the lead line pull:

lead line pull = W × (1 − e) ÷ [es × (1 − en)], where s is the number of sheaves between the last part and the drum. With e = 1 it reduces to W ÷ n. This is our own derivation, shown so you can check it; it is not quoted from a standard or a manufacturer.

Example: 21,000 lb total load, 5,400 lb allowable pull, e = 0.98 and s = 1. Without the option, 21,000 ÷ 5,400 = 3.89 gives 4 parts. With it, 4 parts give 21,000 × 0.02 ÷ (0.98 × 0.07763) = 5,520.6 lb on the lead line, over the limit, and 5 parts give 4,460.6 lb. So the option raises the answer to 5 parts. 0.98 is an example value chosen for this tool, not a published rating. Use the efficiency your crane manufacturer gives for its sheaves and bearings, or leave the option off.

Sheave losses also set a floor: however many parts you add, the lead line never drops below W × (1 − e) ÷ es. If the allowable pull is below that floor, the calculator reports that no reeving works.

Which line pull to enter

Enter the lowest of the limits that apply to this crane and rope: the hoist's rated line pull for the layer and drum in use, and the rope's allowable pull from its rating and required design factor. OSHA's rope selection rules are in 29 CFR 1926.1414, and 29 CFR 1926.1417 (paragraph (a)) requires following the manufacturer's procedures. ASME B30.5 applies to mobile cranes. No standard text, rope tables or manufacturer charts are reproduced here.

The crane manufacturer's load chart, its reeving and line pull notes, and the wire rope rating govern. Use the lower of the hoist's rated line pull and the rope's allowable pull, and never lift more than the chart allows at the actual radius.

Units and limits

Enter weights in lb, kg or metric tonnes (t); switching units converts the entered values using 1 lb = 0.45359237 kg from NIST's SI conversion factors. Line pull is entered in the same unit as weight-equivalent force. A metric tonne is 1,000 kg, not a 2,000 lb US short ton.

The model is static. It leaves out acceleration and braking, side loading, wind, rope weight beyond what you add, and drum layer effects. Reeving must also suit the block and boom head sheaves, which this tool does not check.

Preparing for a crane written exam? Try the NCCCO written practice test to see which load chart and rigging topics need work.

Get the fewest parts of line that keep each line within its allowable pull. A study aid; the manufacturer's load chart and wire rope rating govern real lifts.

Try one free question

Try one question

Question 1 of the free 10-question check on NCCCO written. No signup. Then ask Hook, the AI study assistant, why the answer is right and the others are wrong.

Question 1 of 10 · free checkUntimed

Operations

Which action creates side loading on a crane boom?

Press A-D or 1-4 to choose an answer while this question is on screen.

Choose an answer to begin

Free NCCCO written study plan

A week-by-week plan from today to your exam, weighted to the published exam outline. We show it here and email you a copy.

Ask Hook before you buy AI your AI study assistant

See what's on the NCCCO written exam, test yourself with 5 quick questions, or find the plan that fits you.

Terms this tool uses

Published references

From the blog

Preparing for the NCCCO written exams?

You just found the minimum parts of line for a lift. The free 10-question check shows which written-exam topics to fix first, no signup. The Boom Angle course drills them and explains every answer.

Take the free 10-question NCCCO written check

The NCCCO written course

Available now · instant access

The NCCCO written course

  • 8modules of lessonsEvery task on the outline
  • 3timed practice exams95 questions in 90 minutes and 28 in 60
  • 524practice questionsEach one explained
  • 2worked calculationsStep by step
  • 1week-by-week study planSet to your exam date

Turn a practice answer into a study step. In untimed practice, ask Hook AI about any question you answer, follow up, then see your weakest topics and what to drill next.

Core + Specialty course$99

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

See the course

Compare plans

Every answer comes with a full explanation.

By the Boom Angle editorial team. Report an error.

Add this calculator to your site

Copy this HTML with its attribution link. The frame scrolls to show the calculator and explanation; no external script is needed.