NASCLA reference finder: pick which of the 24 listed books to open first

Read a job situation and pick the listed reference you would open first. Each answer explains why that title fits and what the other three cover.

Original situations · 37 questions

NASCLA reference finder

See all 24 references ↓

Read the job situation and pick the listed reference you would open first. Every answer says why that title fits and what each of the others covers.

Set 20261106 · 0 of 37 answered · 0 correct

Question 1 of 37

A subcontractor has not been paid and asks about lien rights and payment bonds. Which reference do you open first?

The NASCLA Commercial General Building exam is open book, and you bring the 24 listed references yourself. Much of the time on a lookup question goes to deciding which book to open. This drill practices that call. For the full list with editions and the tabbing rules, read the NASCLA reference books guide, and for how the twelve subject areas are weighted, see the NASCLA exam outline.

How the drill works

Each set serves all 37 situations in a shuffled order, with the four options shuffled too. Check your answer and the explanation says why the right title fits and what each of the other three is about.

Your score is one point per situation, out of 37. At the end you see your misses by subject area, so you know which books to tab or skim next. Hit New shuffle for a fresh order. Use the set number if you report an error.

Worked examples

Example 1: steel joists on the truck

Step 1: name the thing in the situation. It is steel joists and joist girders, and the task is lifting and setting them. Step 2: look for a title that names it. SJI Technical Digest No. 9 is titled for handling and erecting steel joists and joist girders. Step 3: rule out the near misses. The SDI manual is about steel deck, BCSI is about wood trusses, and the PCI manual is about precast concrete. The answer is SJI Technical Digest No. 9.

Example 2: a payroll tax question

Step 1: the subject is the company's payroll taxes, not the building. Step 2: that is business and law, and the NASCLA Contractors Guide to Business, Law and Project Management names both. Step 3: Construction Project Management and Construction Jobsite Management are about running projects and sites, not company taxes. The answer is the NASCLA Contractors Guide.

The 24 listed references and what their titles cover

Short titles as the drill uses them. The bulletin lists the full titles, editions and publishers; the reference books guide repeats them.

ReferenceWhat the title says it covers
Mechanical and Electrical Systems for Construction ManagersThe mechanical and electrical systems in a building
ICC A117.1-2017, Accessible and Usable Buildings and FacilitiesHow to make buildings and facilities accessible
BCSI (handling, installing, restraining and bracing wood trusses)Handling, installing, restraining and bracing metal plate connected wood trusses
Carpentry and Building ConstructionCarpentry and general building construction
29 CFR 1926 (OSHA construction standards)The federal safety and health rules for construction
Construction Jobsite ManagementRunning the jobsite
Construction Project ManagementManaging construction projects
NASCLA Contractors Guide to Business, Law and Project ManagementRunning a contracting business: business, law and project management
PCI Erectors' Manual (erection of precast concrete products)Erecting precast concrete products
Green Building FundamentalsGreen building
Gypsum Construction HandbookGypsum board and gypsum construction
SJI Technical Digest No. 9 (handling and erection of steel joists and joist girders)Handling and erecting steel joists and joist girders
International Building CodeThe model building code
ACI 318, Building Code Requirements for Structural ConcreteThe building code requirements for structural concrete
PTI Level 1 Field Fundamentals (unbonded post-tensioning)Field work on unbonded post-tensioning
Modern Masonry: Brick, Block, StoneBrick, block and stone masonry
Pipe and Excavation ContractingPipe and excavation contracting
Principles and Practices of Commercial ConstructionHow commercial buildings are built
Roofing Construction and EstimatingBuilding and estimating roofs
CRSI Placing Reinforcing BarsPlacing reinforcing bars
SDI Manual of Construction with Steel DeckConstruction with steel deck
ACI Contractor's Guide to Quality Concrete ConstructionQuality concrete work from the contractor's side
EPA Developing Your Stormwater Pollution Prevention PlanWriting a stormwater pollution prevention plan for a construction site
ANSI/EIMA 99-A-2017 (EIFS)Exterior insulation and finish systems

This is a map of titles, not a summary of their contents. Next, map your weeks with the NASCLA study plan builder, drill the where-to-look cards in the NASCLA flashcards, and read the NASCLA study guide for when to tab during your plan.

NASCLA reference finder FAQ

Why practice choosing a book for an open-book exam?

Because the clock includes your lookups: 115 scored questions in 330 minutes. Every minute spent in the wrong book comes out of the next question. Knowing which title to grab before you read the options keeps lookups short, and it tells you which books most need tabs.

Do I need all 24 references on exam day?

The test center supplies none of them, so any book you leave at home is one you cannot open. Which ones you buy is your call; the reference books guide lists the editions PSI allows and the rules for marking them. Two of the 24, the OSHA construction standards and the EPA stormwater guide, can be read free online.

Are these situations taken from the exam?

No. Every situation is written for this site, and each answer is plain from the book's title alone. They are not recalled exam items, and nothing here quotes or summarizes what any listed book says on a point. Use them to learn the shelf, then read the topic in your own copy.

37 original job situations, each with four of the 24 references PSI lists for the NASCLA Commercial General Building exam. The answer is plain from the book's title, and every answer says why. No exam item or reference text is used.

Try one free question

Try one question

Question 1 of the free 10-question check on NASCLA Commercial. No signup. Then ask Seal, the AI study assistant, why the answer is right and the others are wrong.

Question 1 of 10 · free checkUntimed

Procurement and Contracting Requirements

A subcontractor on a bonded public project has not been paid for completed work. Which bond is meant to protect it?

Press A-D or 1-4 to choose an answer while this question is on screen.

Choose an answer to begin

Free NASCLA Commercial study plan

A week-by-week plan from today to your exam, weighted to the published exam outline. We show it here and email you a copy.

Ask Seal before you buy AI your AI study assistant

See what's on the NASCLA Commercial exam, test yourself with 5 quick questions, or find the plan that fits you.

Sources

From the blog

Preparing for the NASCLA Commercial exam?

Knowing which book to open is half of a lookup question; the other half is the content. The free 10-question check scores you by subject area in minutes, no signup. The Bid Bond course then has a lesson for each of the twelve areas that shows which listed reference to open and how to apply it.

Take the free 10-question check

The NASCLA Commercial course

Available now · instant access

The NASCLA Commercial course

  • 12modules of lessonsEvery task on the outline
  • 4full-length timed exams115 questions in 330 minutes each
  • 472practice questionsEach one explained
  • 1week-by-week study planSet to your exam date

Turn a practice answer into a study step. In untimed practice, ask Seal AI about any question you answer, follow up, then see your weakest topics and what to drill next.

NASCLA Commercial course$199

Terms and refunds · Secure checkout by Stripe · Billed by Nori Software

See the course

Compare plans

Every answer comes with a full explanation.

By the Bid Bond editorial team. Report an error with the set number and question number.