King stud vs jack stud: what it means on an inspection
A jack stud is a short stud under each end of a header that carries the header's load down to the plate. A king stud is the full-height stud beside each jack stud, running from the bottom plate to the top plate. The jack stud carries the load, and the king stud steadies it and ties the wall together.
Use this diagram
How to tell them apart in a framed wall
- Find the opening. Look for the rough opening of a door or window and the header above it.
- Look under the header. The short studs under each end of the header are the jack studs. They stop at the header; they do not run to the top plate.
- Look beside the jack studs. The full-height studs next to them, nailed to the jack studs and reaching from plate to plate, are the king studs.
- Check the count. The header table or the plan says how many jack studs each side needs, which grows with the span and load. Most openings have at least one king stud each side.
- Check the nailing. The studs are fastened together so they act as a unit. Look for the fastening required by your edition's fastening schedule rather than counting nails from memory.
Try one question
Question 1 of the free 10-question check on ICC B1. No signup. Then ask Plumb, the AI study assistant, why the answer is right and the others are wrong.
Public Safety and Special Construction
In a new bedroom, the only emergency escape window has a keyed sash lock, with the key hanging on a hook beside the window. What should the inspector do?
Press A-D or 1-4 to choose an answer while this question is on screen.
Choose an answer to begin
Common mix-ups
- Jack stud versus trimmer. Trimmer is another name for a jack stud. Questions may use either word.
- King stud versus cripple stud. Cripple studs are the short studs above a header or below a window sill. King studs run the full height. The tall ones are king studs and the short ones are not.
- Jack stud versus header. The header is horizontal and spans the opening. The jack stud is vertical and holds the header up.
- Posts are different. A built-up post inside a wall or at a corner is not a king stud, even if it is next to an opening.
Ask Plumb before you buy AI your AI study assistant
See what's on the ICC B1 exam, test yourself with 5 quick questions, or find the plan that fits you.
The ICC B1 course
Available now · instant accessLearn how the IRC is laid out, drill finding sections fast, then practice. Written for the 2024 IRC.
- 7modules of lessonsEvery task on the outline
- 4full-length timed exams60 questions in 120 minutes each
- 426practice questionsEach one explained
- 4worked calculationsStep by step
- 8timed code lookups a setFind it fast in IRC, with your median time
- 1week-by-week study planSet to your exam date
Turn a practice answer into a study step. In untimed practice, ask Plumb AI about any question you answer, follow up, then see your weakest topics and what to drill next.
Instant access. Terms and refunds · Secure checkout by Stripe · Billed by Nori Software
Every answer comes with a full explanation.
King and jack studs on the B1
These terms sit in wall construction, 27% of the B1. The test is usually definitional: pick which stud carries the header, or describe what supports a header's ends. The header tables in R602.7 also give the number of jack studs needed at each end, so read that count from the same row as the header size.
Practice it
Pair this page with wall header, which explains the member the jack studs carry, and cripple wall, which covers the other kind of short framing. Use the IRC chapters guide to see where wall framing sits in the book, or return to the IRC terms glossary.
Know your wall framing terms? Check the rest of the B1
Take the free 10-question check. It is weighted to the seven B1 areas, scored by area and needs no signup, so you see which area costs you the most points. The Rafter Tie course adds timed practice exams, a lesson for each outline area and a study plan built from your exam date.
Sources
Show the list
- B1 Residential Building Inspector Content Outline, International Code Council.
- 2021 IRC contents and 2024 IRC contents, International Code Council. Chapters are named, not quoted; open your own copy for the text.
Facts come from the sources listed above. If something has changed, tell us and we will correct it within 2 business days.
Your next step
Ready to see where you stand on ICC B1?
Free, untimed and scored by domain. No signup.
Start the free 10-question checkB1 course with IRC navigation drills. Lessons, timed practice exams and a plan around your exam date. Get B1 course with IRC navigation drills · $99 See the plans or read the free sample lesson.Terms and refunds
Want a timed run? Try the free 25-question mini-mock. The first 5 need no email.
Prefer paper? Free printables
- Print the study checklist (free PDF). Topics to cover, on one printable page. No email.
- Print a class quiz (free PDF). 5 practice questions with an answer key on page 2.
- Print the flashcards as cut-out cards (free PDF). The free flashcard sample, ready to cut and carry.
From the blog
- ICC B1 roof and ceiling construction: what to know
- ICC B1 wall framing, headers and masonry topics
- ICC B1 foundation inspections: footings and walls